Thinking about buying a lot in Cottage Grove? The right parcel can set you up for an efficient build and a smooth move. The wrong one can stall your plans and inflate your budget. You are smart to get clear on zoning, utilities, septic feasibility, and the steps that make a land deal work in this area. This starter guide gives you a simple plan for evaluating lots in both the Village and the Town of Cottage Grove so you can move forward with confidence. Let’s dive in.
Cottage Grove land basics
Cottage Grove sits in eastern Dane County within the Madison metro. You will see three common lot types: in‑village infill lots on existing streets, newly platted subdivision lots, and rural acreage parcels. Each comes with different utility options, permit paths, and site costs.
Pricing varies by size, utility access, frontage, zoning, and proximity to Madison. For current values, lean on multiple sources like local MLS data, Wisconsin Realtors Association reports, and county parcel records. Always confirm current comparable sales with a local agent before you write an offer.
Village vs. Town: why it matters
Your first step is to confirm jurisdiction. The Village of Cottage Grove and the Town of Cottage Grove operate under different rules. Some Town parcels are also governed by Dane County ordinances. That impacts zoning, setbacks, lot size minimums, utility access, permitting, and taxes.
- Inside the Village: You will follow village zoning and building codes. In many cases, municipal water and sewer are nearby, but you should verify the service boundary and connection fees.
- In the Town or unincorporated areas: You will work with Town of Cottage Grove and Dane County Planning and Development. Expect private wells and onsite wastewater systems unless a municipal extension is confirmed.
When in doubt, call the local planning office and request current zoning details for the parcel.
Zoning and permits to verify
Start your due diligence with the use rules that govern the property. Confirm:
- Zoning designation and permitted uses, including single‑family residential or agricultural.
- Minimum lot size, setbacks, maximum lot coverage, and buildable area.
- Overlays such as shoreland, floodplain, conservancy, or farmland preservation.
- Land division rules if you plan to split or create lots, which may require a certified survey map or a plat.
- Required permits. These can include building and land‑use permits, driveway or culvert permits, stormwater and erosion control for larger projects, and possible right‑of‑way agreements for access.
If you need clarity, request a zoning compliance letter from the applicable planner. It is a simple way to align expectations early.
Utilities and access checks
Utilities and access drive both cost and timeline. Confirm each item in writing before you close.
- Water and sewer: Village lots often have municipal service. Rural parcels typically need a private well and septic. Verify service boundaries and any connection or assessment fees.
- Electric and gas: Identify the local utility provider and ask about extension costs and schedule to serve your site.
- Broadband: Coverage varies by street. Contact providers directly for speeds and availability tied to the parcel address or tax ID.
- Road access: Determine if the road is public or private. For private roads or long driveways, review maintenance obligations and obtain any required driveway permits.
Septic, wells, and soils
If the parcel is not on municipal sewer and water, septic feasibility and well conditions are key. Plan early testing.
- Soil evaluation: A soil test and percolation evaluation will determine what type of onsite wastewater system is allowed. Dane County issues septic permits and will outline testing and submittal requirements.
- System type: Challenging sites with clay soils, bedrock, or high groundwater may require engineered systems or a mound, which adds cost and time.
- Preliminary tools: The USDA NRCS Web Soil Survey and county soil maps are good starting points. Always follow up with site‑specific testing by a licensed professional.
- Well considerations: Review county well records and discuss typical depths and water conditions in the area with a local well driller.
Wetlands and floodplain risks
Environmental constraints can limit where and how you build.
- Floodplain: Use FEMA flood maps to check for mapped flood zones. Building in flood areas may require elevation or mitigation and can reduce the usable building envelope.
- Wetlands: Wisconsin DNR resources and federal regulators oversee wetland permitting. If indicators are present, a formal wetland delineation by a consultant may be needed.
- Shoreland: Parcels near lakes or streams have additional setbacks, vegetation buffers, and permit requirements under state and local rules.
A quick desktop screen is helpful, but flag anything uncertain for professional review during your contingency period.
Costs, taxes, and assessments
Budget beyond the purchase price so you are not surprised later.
- Property taxes: Check current assessed value and tax bills. Taxes can change once you improve the property.
- Special assessments: New subdivisions often carry assessments for streets, sewer, or sidewalks. Ask the municipality about pending or planned assessments.
- Carrying costs: Plan for insurance on vacant land, loan interest if you finance, surveys, soil and environmental testing, and utility or driveway installation.
- Site development: Include grading, drainage, erosion control, septic installation, well drilling, and any wetlands mitigation if required.
Get written estimates from local contractors and utility providers before you remove contingencies.
Financing options for land
Vacant land financing works differently than a standard mortgage.
- Lot loans: Lenders often require higher down payments and shorter terms. Some want a clear plan for development.
- Construction loans: These can cover the build and then convert to a permanent mortgage after completion.
- Combined pathways: You can purchase the land and later secure a construction loan when plans and bids are final.
- Rural programs: Certain federal rural loan programs may apply to eligible parcels. Review eligibility criteria and current rules before relying on them.
Local banks, credit unions, and mortgage brokers familiar with Dane County can outline current products and requirements.
Smart offer contingencies
Protect your interests with clear contingencies and timelines. Consider making your offer contingent on the following, with defined deadlines and seller cooperation.
- Boundary and topographic survey.
- Zoning and permitted use confirmation.
- Access verification, including driveway permits or easements.
- Utility availability and written cost estimates for extensions.
- Septic feasibility, including soil tests and sanitary permit pathway.
- Well feasibility and review of local well records.
- Floodplain and wetland reviews, and wetland delineation if indicated.
- Title commitment review, including easements, covenants, deed restrictions, and any conservation areas.
- Environmental review based on past land use. Consider a Phase I assessment for uncertain sites.
- Confirmation of special assessments or planned public works.
- Lender approval and appraisal if financing.
A clear contingency plan keeps your risk low and your schedule realistic.
Due diligence checklist
Use this checklist as a starting point. Customize it to the parcel and your goals.
- Confirm jurisdiction: Village vs Town vs Dane County oversight.
- Verify zoning designation and permitted uses. Request a zoning compliance letter.
- Order a current boundary survey. Add a topographic survey if you plan grading.
- Review title commitment and recorded documents for easements and restrictions.
- Confirm public road frontage or a recorded access easement. Verify maintenance responsibilities.
- Check municipal water and sewer availability. Get connection and assessment details in writing.
- Identify electric, gas, and broadband providers. Request extension costs and timelines.
- Schedule soil and percolation tests. Confirm sanitary permit requirements with Dane County.
- Review well feasibility and county well records.
- Screen for floodplain and wetlands. Order a wetland delineation if indicators exist.
- Evaluate environmental risk based on past uses. Consider a Phase I assessment for uncertain sites.
- Review HOA covenants or deed restrictions if applicable.
- Ask the municipality about pending special assessments or public projects.
- Build a site development budget: septic or OWTS, well, driveway and culvert, grading and drainage, utility hookups, erosion control, permits and engineering.
- Gather written estimates from local contractors and utilities.
- If financing, confirm lender requirements and timelines.
Who to call locally
You will interact with a mix of public offices and licensed pros during the process.
- Village of Cottage Grove planning, zoning, and building for in‑village parcels.
- Town of Cottage Grove and Dane County Planning and Development or Land and Water Resources for unincorporated parcels.
- Dane County Register of Deeds for deeds, easements, covenants, and parcel history.
- Dane County Assessor for assessed values and tax data.
- Wisconsin Department of Natural Resources for wetlands, shoreland, and environmental permitting.
- FEMA Flood Map Service Center for floodplain determinations.
- USDA NRCS Web Soil Survey for preliminary soils data.
- Licensed local professionals: land surveyors, septic designers and soil testers, civil and site engineers, environmental consultants, real estate attorneys, and lenders experienced with vacant land and construction loans.
Build with confidence in Cottage Grove
Buying land here can be straightforward when you confirm jurisdiction, test the soils, verify utilities, and map environmental constraints early. With the right plan and the right team, you can control costs and set a realistic build timeline.
If you are weighing lots in the Village or the Town, we are happy to help you compare options, structure smart contingencies, and coordinate the right local experts. For calm, white‑glove guidance from a team that has handled land, new‑build, and suburban moves across Dane County, reach out to Lessing Real Estate.
FAQs
Can I build right after closing on Cottage Grove land?
- Not always. Confirm zoning, septic or sewer path, well feasibility, and secure building and related permits before scheduling construction.
Do Village of Cottage Grove lots have water and sewer?
- Many village lots connect to municipal services, but boundaries vary. Verify availability and hookup or assessment fees with the municipality before you buy.
What tests do I need before buying land in Dane County?
- At minimum, plan for a boundary survey, soil and percolation tests for septic, and floodplain and wetland checks. Add topographic and environmental studies as needed.
How hard is it to get a septic permit near Cottage Grove?
- It depends on soils, groundwater, and site conditions. Good soils make it straightforward. Challenging soils may require engineered or alternative systems and add cost and time.
Will a lender finance vacant land around Madison?
- Some do, typically with higher down payments and shorter terms. Construction loans are also common and can convert to a permanent mortgage after the build.